BASE HOSPITAL - SIYAMBALANDUWA
Design and construction of new building complex at Base Hospital, Siyambalanduwa
As a part of the post tsunami healthcare infrastructure development drive, hospitals that were severely affected by the tsunami were identified for development
The project was funded by Medical Teams International and was undertaken by Premium as a turnkey project covering design, construction and technology supply, the first of its kind in Sri Lanka undertaken by a local healthcare contractor
Facility Description
- 12,500 Sq Ft
- Outpatient department
- Emergency treatment unit
- Fully equipped laboratory
- Blood bank
- Maternity ward and labor rooms
- Dental surgery
- Specialist consultation clinics
- Pediatric high dependency unit
- Operating theatre
- Administrative unit
Premium’s Scope
- Concept development, hospital planning and layout finalization with equipment planning.
- Complete design and engineering with architectural, master planning, structural, mechanical and electrical and service engineering planning works
- Preparation of BOQ, detailed architectural and engineering working drawings
- Civil construction
- Contract administration and project management services with multiple stakeholder input.
- Project completion within stipulated project timeline, quality and cost, handing over and management of defect liability period